This site uses cookies to offer you a better browsing experience. By continuing to navigate through this site or by clicking Accept,
you consent to the use of cookies on your device as described in our privacy notice.    

<< back
Block 38 South Waterfront Download PDF
Slideshow image

| |

GRINNELL SOLUTIONS:
Block 38 Waterfront is a high profile mixed-use 28-story condominium set. It aligns itself with five other "green" projects in the downtown waterfront district. Mixed uses include living, retail, fitness, restaurants and medical uses. GRINNELL Mechanical products were installed on the chilled water, condenser water, domestic water and the mechanical room.


PROJECT BENEFITS:

  • GRINNELL Mechanical Products enabled the contractor to use Schedule 10 stainless pipe in lieu of copper tube.

LOCATION: Portland, OR

MARKET: HVAC/Plumbing

COMPLETED: Currently ongoing construction

DISTRIBUTOR: State Pipe & Supply,
Vancouver, WA

ENGINEER: Dan Buck / Bullion Engineers

GENERAL CONTRACTOR:
Hoffman Construction

MECHANICAL CONTRACTOR: JH Kelly

SPECIFICATIONS:

  • 4" through 8" painted couplings, fittings, and butterfly valves
  • 6" painted couplings with Tri-Seal gaskets for domestic potable

Copyright © 2024 Johnson Controls. All Rights Reserved   Toll Free: 800-558-5236 | Tel: +1-401-781-8220 | Privacy Policy | Terms of Sale Johnson Controls